Hotmail  |  Gmail  |  Yahoo  |  Justice Mail
powered by Google
WWW http://www.JusticeForNorthCaucasus.com

Add JFNC Google Bar Button to your Browser Google Bar Group  
 
 
Welcome To Justice For North Caucasus Group

Log in to your account at Justice For North Caucasus eMail system.

Request your eMail address

eMaill a Friend About This Site.

Google Translation

 

 

Russia Plans Massive Expansion of Nord Stream Pipelines

posted by eagle on April, 2013 as ANALYSIS / OPINION


Russia Plans Massive Expansion of Nord Stream Pipelines

Publication: Eurasia Daily Monitor Volume: 10 Issue: 68
April 11, 2013 05:10 PM Age: 15 hrs






Russian President Vladimir Putin with Dutch Prime Minister Mark Rutte (Source: Reuters)

On April 8 in Amsterdam, Russian President Vladimir Putin and Dutch Prime Minister Mark Rutte witnessed the signing of an agreement of intent to expand the Gazprom-controlled Nord Stream pipeline system into the Netherlands and potentially onward to the United Kingdom. The CEOs of Gazprom and of Nederlandse Gasunie, Aleksei Miller and Paul van Gelder, respectively, signed the document, following Putin and Miller’s recently announced initiative to expand Nord Stream.

This intention forms part of a vast program of building new export pipelines (Nord Stream Three and Four, "Yamal Two,” South Stream—see EDM, April 5), which in combination with existing capacities would far exceed Russia’s foreseeable gas export possibilities to Europe, or any foreseeable European demand for Russian gas. It can only begin to make some sense if Russia totally stops using Ukraine’s transit system—a possibility to which Moscow has begun to allude in order to intimidate Ukraine (East European Gas Analysis, April 7). 

The Groningen-based, state-owned Gasunie is a minority shareholder in the Gazprom-led Nord Stream consortium (see below). The proposed expansion of Nord Stream would add (in sequence) a third and a fourth line to its existing two lines on the Baltic seabed from Russia to Germany; it would reach the Netherlands with those new lines; and it would use the fourth line to deliver gas to Britain through an existing pipeline on the seabed of the North Sea. The third and fourth lines are planned for annual capacities of 27.5 billion cubic meters (bcm) each, equal to the existing capacities of Nord Stream One and Nord Stream Two. Thus the system’s overall capacity would double from 55 bcm to 110 bcm per year.

While Nord Stream One and Two are owned and operated by the Gazprom-controlled consortium along the entire route on the Baltic seabed, the proposed new lines would be governed by Gazprom-led joint ventures or consortiums for each distinct segment along the route (resembling the South Stream project’s model) (Gazprom press release, April 8; Interfax, April 8, 9; Kommersant, April 9).

On his return from the Netherlands, Miller told a Nord Stream shareholders’ meeting that Gazprom would wait at least six months before signing any binding documents on Nord Stream Three (Interfax, April 9). He was apparently alluding to decisions yet to be taken about sequencing or prioritizing Russia’s multiple export pipeline projects (see above). On April 4, Russia’s Natural Resources Ministry informed each country riparian to the Baltic Sea that the Nord Stream project company has started the environmental impact assessment study for the third and fourth lines of Nord Stream (Interfax, April 4).

The Nord Stream consortium is comprised of Gazprom with 51 percent of the shares, the German Wintershall and E.ON Ruhrgas with 15.5 percent each, and Gaz de France and Nederlandse Gasunie with 9 percent each. The existing two offshore lines, from Russia’s end of the Baltic Sea to Greifswald on the German littoral, cost (officially) €5.7 billion ($7.5 billion) to build from 2005 to 2012. The first gas flowed through Nord Stream One in November 2011 and through Nord Stream Two in October 2012. Both lines have carried, thus far, only 17.5 bcm in toto, according to Gazprom. Thus, the system operates at approximately one third of its capacity at present (Interfax, April 2).

Yet, Moscow proposes to (literally) double down on Nord Stream, and moreover to do so simultaneously with the other export pipeline projects. Gazprom is in preliminary talks since 2012 with BP about supplying Britain with Russian gas. Gazprom’s stated ambition is to increase deliveries to Britain from the present annualized rate of 8 bcm (mostly on spot market contracts) to 40 bcm through Nord Stream’s fourth line (Kommersant, April 3, 9). For those deliveries, however, Gazprom wants long-term contracts (as opposed to spot market deals) with British importers. This, according to Miller, is "a key issue” (Interfax, April 9).

Gazprom had initiated this discussion with BP and Centrica (British Gas, Scottish Gas) in 2007–2008, in close connection with Gasunie’s admission into the Nord Stream consortium and putative transit of Russian gas through the Netherlands. The Dutch then-Prime Minister Jan Peter Balkenende and Putin had witnessed that signing (see EDM, November 9, 2007). Since then, however, liquefied natural gas (LNG) and liquefied shale gas from the United States do not leave much scope in Britain for Russian pipeline-delivered gas. Exemplifying the prevailing trend, Centrica recently signed an agreement with US company Cheniere Energy on liquefied shale gas supply from the Sabine Pass LNG Terminal (in Louisiana) to the UK for the next 20 years (www.naturalgaseurope.com, March 22). Whether the limited scope for Nord Stream gas in Britain could justify massive investments in new pipeline construction is far from certain.

In Amsterdam, Putin and Miller discussed possible transit routes of Russian gas to the UK through the proposed Nord Stream system in the Netherlands. Gasunie owns 60 percent of the shares in the Balgzand-Bacton pipeline, with a capacity of 20 bcm per year, connecting the Netherlands with England on the seabed of the North Sea. The German E.ON Ruhrgas and the Belgian Fluxys own stakes of 20 percent each in the Balgzand-Bacton pipeline. Gazprom has the option (not yet consummated) to acquire a 9-percent stake in that pipeline from Gasunie, as part of the price for Gasunie’s admission into Nord Stream. Thus, three Nord Stream partners—Gazprom, E.ON Ruhrgas, Gasunie—might find the Balgzand-Bacton pipeline interesting for possible deliveries to Britain.

However, returning from Amsterdam and after meeting with Nord Stream shareholders, Miller declared that the Netherlands is just "one of the options” for the transit of Nord Stream gas to Britain (Interfax, April 9). Indeed, Gazprom can turn to Belgium for another transit option. Gazprom holds a 10-percent stake in the Zeebrugge-Bacton Interconnector, from Belgium to England on the seabed of the North Sea, with a capacity of 25 bcm per year, and 90-percent owned by the Belgian Fluxys. Clearly, Gazprom will be trying to play off the Netherlands and Belgium against each other. It will probably seek to acquire ownership stakes in transmission and distribution pipelines and storage sites, in return for allocating supply and transit volumes through the proposed Nord Stream system.

http://www.jamestown.org/single/?no_cache=1&tx_ttnews%5Btt_news%5D=40718&tx_ttnews%5BbackPid%5D=7&cHash=36458fb81ecccf7ad99a845bb74f7af9


comments (0)


1 - 1 of 1



 RSS FEED


New Posts



Search Analysis Opinion



ANALYSIS / OPINION



Archive


 december 2013

 november 2013

 october 2013

 september 2013

 august 2013

 july 2013

 june 2013

 may 2013

 april 2013

 march 2013

 february 2013

 december 2012

 august 2012

 july 2012

 april 2012

 march 2012

 february 2012

 july 2011

 june 2011

 may 2011

 april 2011

 march 2011

 february 2011

 january 2011

 december 2010

 november 2010

 october 2010

 september 2010

 august 2010

 july 2010

 june 2010

 may 2010

 april 2010

 march 2010

 february 2010

 january 2010

 december 2009

 november 2009

 october 2009

 september 2009

 august 2009

 july 2009

 june 2009

 may 2009

 april 2009

 march 2009

 february 2009

 january 2009

 december 2008

 november 2008

 october 2008

 august 2008

 july 2008

 may 2008

 february 2008

 december 2007

 november 2007

 october 2007

 september 2007

 august 2007

 july 2007

 june 2007

 may 2007

 april 2007

 march 2007

 february 2007

 january 2007

 december 2006

 november 2006

 october 2006

 september 2006

 august 2006

 july 2006

 june 2006

 may 2006

 april 2006

 march 2006

 february 2006

 january 2006

 december 2005

 november 2005

 october 2005

 september 2005

 august 2005

 july 2005

 june 2005

 may 2005

 april 2005

 april 2000

 february 2000



Acknowledgement: All available information and documents in "Justice For North Caucasus Group" is provided for the "fair use". There should be no intention for ill-usage of any sort of any published item for commercial purposes and in any way or form. JFNC is a nonprofit group and has no intentions for the distribution of information for commercial or advantageous gain. At the same time consideration is ascertained that all different visions, beliefs, presentations and opinions will be presented to visitors and readers of all message boards of this site. Providing, furnishing, posting and publishing the information of all sources is considered a right to freedom of opinion, speech, expression, and information while at the same time does not necessarily reflect, represent, constitute, or comprise the stand or the opinion of this group. If you have any concerns contact us directly at: eagle@JusticeForNorthCaucasus.com


Page Last Updated: {Site best Viewed in MS-IE 1024x768 or Greater}Copyright © 2005-2009 by Justice For North Caucasus ®